The cove.tool gives the project team every opportunity to make the best decisions as early in the planning process as possible to increase the probability of achieving challenging energy performance goals. It can highlight the positive and negative trade-offs of multiple project objectives and find key combinations of variables. This information results in optimized first costs that are less expensive to implement providing a more efficient building.

 How does cove.tool work?

Case study: cove.tool and EnergyPlus

In January 2016, Matthew Early, vice president for campus services at Emory University in Atlanta, faced a challenge. Like many building owners, Emory had selected a great architect and engineer to design a new 110,000-sq.-ft. (10,220-sq.-m.) Campus Life Center (CLC). However, there was no way to understand if the design decisions being made also made sense from the perspectives of cost and energy. With a fixed budget to work with, first costs were rising as the design team labored to meet the aggressive energy targets of the university.

 

NameEmory University Campus Life Center
LocationAtlanta, GA
Size110,000 sq ft
BudgetApprox. $90M
Energy EUI59 Kbtu/sf/yr
Daylight sDA45%
Glare (DGP)Imperceptible (0.35)

 

The design team proposed over 100 possible energy conservation measures (ECM), which were then shortlisted to 22 energy conservation measures. These ECM’s were then grouped into 6 bundles to reach the targeted EUI for the Campus Life Center.  Each of these 6 Bundles can be seen in the table below. The table highlights the different strategies for each of the bundles. Some strategies are common to all the bundles and have been included in the baseline model. These strategies include, LED lighting and Lighting Occupancy Sensors. Each of the bundles has specific mechanical strategies. These mechanical strategies have been selected to represent different System Options to be analyzed with all the different strategies. The set point adjustment strategy, which appears only in bundle 5 and 6, has been removed specifically from the two bundles, and is tested with all the bundle system options to test if there is a way to get to lower EUI at a low cost.

Running the cove.tool analysis on this project saved approx. $0.6M by selecting a more optimal way to meet the EUI target set forth by the team.

Working on this project required a deep understanding of holistic sustainability including energy use, daylight, glare, occupant comfort and life cycle cost. We got involved in this new construction during schematic design with the goal to create a cost optimal high performance solution. We worked closely with the owner, architect, contractor and mechanical engineer to run a unique cost vs energy optimization and pick out the high performance strategies that were giving the highest benefit for the cost.

 

Further, with the selected strategies we created an accurate energy model using Design Builder (with the EnergyPlus Engine). The design team used this energy model as a tool throughout the design process to test changes to the design. The graph below shows how we tracked the energy use of the project with every design and engineering decision made on the project.

 

The table below outline the various inputs that were used for the creation of the energy model using the two different software, DesignBuilder and cove.tool.

 

DesignBuilder (EnergyPlus)cove.tool
Total Building Area109891 sqft109891 sqft
Above Grade Wall ConstructionSteel Framed Walls U-Values:0.05Steel Framed Walls U-Values:0.05
Roof ConstructionMetal deck with R-40 Insulation U-Value:0.025Metal deck with R-40 Insulation U-Value:0.025
Below Grade Wall ConstructionCMU Wall with R-40 Insulation C-0.024CMU Wall with R-40 Insulation C-0.024
External GlazingHeating: 68 F Heating Setback: 60 F  Cooling: 76 F Cooling Setback: 82 FHeating: 68 F Heating Setback: 60 F  Cooling: 76 F Cooling Setback: 82 F
External GlazingVision Glazing U-Value:0.3 SHGC: 0.22 Fritted Glazing U-Value:0.3 SHGC: 0.08 Above Ground Glazing Ratio 40.0%Canopy with Fins, Automatic blinds.Vision Glazing U-Value:0.3 SHGC: 0.22 Fritted Glazing U-Value:0.3 SHGC: 0.08 Above Ground Glazing Ratio 40.0%Canopy with Fins, Automatic blinds.
LightingWhole building [W/sqft]: 1.5Whole building [W/sqft]: 1.5
Lighting SensorsOccupancy sensors [10% credit] Daylight harvestingOccupancy sensors [Partial] Daylight harvesting
Zone HVACVariable Air VolumeVariable Air Volume with Water Heating and Cooling Distribution
Outdoor air37000 CFM37000 CFM
DHW200 Gal/Day200 Gal/Day
Heat RecoveryHeat recovery with 60% Effectiveness for all unitsHeat Exchange Plate

When running the same model on the two different software the following observation about the energy use were made.

Running the two models, there was very little surprise that the equipment, lighting and hot water loads matched exactly between cove.tool and DesignBuilder since they use the same methodology for the calculation. The heating, cooling, fan and pump loads can sometimes vary between an early stage parametric modeling software and a detailed HVAC sizing simulation. Despite these change, overall both the models suggested similar outputs, varying by approx. 2 EUI.

On the whole, it is important to remember the purpose of running the model. No energy model can give the designer, engineer or owner a prediction of the future, but good models can certainly help making better choices through the design process. It is for the purposes of enhanced decision making, that cove.tool becomes not vital to every project.